Skip to main content

The LH Team

We Built our own Studios from Scratch. Powering us from our New Headquarters in Wing Lok St.

All Our Manpower is Organised from within the Firm, Trade by Trade, tool by tool, Brick by brick...

Design Studios are concentrated in our own Studios, and the Construction Team are in house on a seperate floor.

We make our own stuff with our own People......

The LH Team

Architectural Works performed by our Certified Welders. If you need a Staircase approved thru the rooftop with a Heavy Glass Skylight with the Building Department then you are working with right Team. LH's: A & A Team, with AP's & Architects....

LH Offices Shueng Wan

The LH Team

Our Gas Technicians hard at work... All gas works in HK must be certified... We ensure you receive Safe Gas pipes and appliances that last thruout the design life of the unit or longer..... By having in-house gas technicians we can directly discuss innovative positions of gas hot water heaters..to give that streamlined look we all want to see...but in a safe and certified manner....

LH Offices Shueng Wan

In LH we are passionate about Cooking...... ...We don't Design our Kitchens..... ...We Engineer Them...... each Kitchen Space is Uniquely Created, keeps in mind Maximum Storage, Practicality & Uses the Most Advanced Hardware that can be found.... LH Kitchen Hardware comes with Our Lifetime Warranty....

LH Offices Shueng Wan

LH Attention to Detail Crew Coordination

LH Offices Shueng Wan

N. LEHAR

The LH Team

There are many ways to Connect Plumbing (Water) pipes. Compression fittings are a fast way to do, but in Hong Kong most pipes are buried underneath cement and it will corrode with Time. In LH we only use more superior soldering joints (image). In addition to soldering the joints we also bend the pipes rather than using sharp connectors, which further retains the pressure in the plumbing pipes. We use only BS standard Copper pipes & fittings either from UK or Australia. (Image: Our in-house Plumbing Team at work soldering personally every single joint and you can see the pipes are bent rather than using sharp connectors retaining pressure, avoiding low pressure in kitchens and bathrooms.)In addition to soldering the joints we also bend the pipes rather than using a 90 degree connector, which further retains the pressure in the plumbing pipes. We use only BS standard Copper pipe either from UK or Australia, same goes for the connectors. Image: Our in-house Plumber at work soldering personally every single joint and you can see the pipes are bent rather than using sharp connectors retaining pressure.

LH Offices Shueng Wan

LH Materials Selection & Usage

LH Offices Shueng Wan

Client Satisfaction & Finishing

LH Offices Shueng Wan

LH Teamwork and meeting Deadlines

The LH Team

We thread our own gas pipes....

LH Offices Shueng Wan

LH Outdoor

The LH Team

Making way for new piping.....

The LH Team

Diamond Core Drilling allows us Flexibility in running the Air-Conditioning Systems & Water-Piping. This avoids unnecessary Water leakages and seepages in the future by ensuring correct procedure is applied during construction and no shortcuts are taken. Installation requiring these Techniques include: Aircon Installations (proper drainage avoids dripping ACs in the long run), WC relocation, Concealed Hot water heaters & plumbing pipes in general.

LH Offices Shueng Wan

Designing the Old School Way to get things rolling....

LH Offices Shueng Wan

LH Offices Shueng Wan

LH Offices Shueng Wan

LH Offices Shueng Wan

LH Offices Shueng Wan

LH Design Studios

LH Offices Shueng Wan

LH Offices Shueng Wan

Creative thinkers need creative Spacing, Pacing & Collaboration

LH Offices Shueng Wan

We make some of the best most sophisticated kitchens on today's Market. Why not enjoy a full operational Kitchen instead of a pantry at your workplace too... Lifetime warranty on all hardware... by LH

LH Offices Shueng Wan

Setting out Walls....

Houzz: we don’t only create beautiful 3 renders but we create real construction by real people and all our images are real and handmade by our own craftsmen.... Setting out walls early, knowing the final thicknesses of walls including the hand made render, adhesives and finishing materials we predict finishing time frames from get-go and save our clients up to 1 mnth constrcutin time.,,,

The LH Team

LH Team at Work... In LH The Site Manager is an integral Part of our operation.... Mr. Chiu displaying his 3D Capabilities which he utilises from drawing table all the way with hands on ...to the site itself..... An well Qualified Tradesman with an eye for design and the fastest Drafter in LH with an unmatched accuracy.....

The LH Team

We deliver our materials directly ourselves and retain quality control in this way

LH Gas Works

Plumbing and Gas works side by side...Construction in progress with safety valves at every single supply point.

Team Brief

Team needs Coordination via Open Collaborative relay & thorough Discussion of ideas, which is our cornerstone. (internally we speak in over 8 languages & we are a truly International Merge of Talent and Craft in one single Team inside the Office and out in the Field. We have multipurpose Talent touching every possible field in Construction

The LH Team

We have in-house certified Trades including one of our directors certified to use Explosive Cartridge Hilti Direct Fastening Tools driving Directly into Concrete, Speeding up the construction significantly. (removes the stages of drilling, plugging and the using screws for fastening, reducing noise levels and resting in a muckiest much 'cleaner' Construction Process...

The LH Team

Architectural Works performed by our Certified Welders. If you need a Staircase approved thru the rooftop with a Heavy Glass Skylight with the Building Department then you are working with right Team. LH's: A & A Team, with AP's & Architects....

laser measure.jpg

Plumbing

Houzz: we don’t only create beautiful 3 renders but we create real construction by real people and all our images are real and handmade by our own craftsmen

Trenching

Houzz: we don’t only create beautiful 3 renders but we create real construction by real people and all our images are real and handmade by our own craftsmen

Site Surveys

We visit our sites daily & we have around 5-6 sites operational at any given time in. Quality Control, supporting our Trades and ensuring the Projects are moving at the well known LH-Speed is of key importance saving downtime and Expenses for our clients as well as maintaing our own Schedules as we book projects 6-8 months ahead of time.

Deliveries

Yes we love big deliveries and yes its foodpanda, deliveroo and uber all in one :)

AP, T1 & Archtitect Briefing

Team Briefing Regularly with our In-House Team is part of the LH Culture.

The LH Team

We take welding seriously and use it for Structural approval to do crazy things like making holes in rooftops for making way to an internal staircase inside the top floor of a skyscraper....

The LH Team

We take waterproofing seriously and use it for proving that our waterproofing procedure has in fact worked and is certifiable...

LH-Heavy Lifting Team

When it comes to heavy lifting we are that Crew that will lift anything to make things possible....

The LH Team

We use Hilti Certified Bolts whose specs are calculated by our Structural engineers......to make the structures work and get the Certification from the HK Building Department

The LH Team

We work together to solve problems....

The LH Team

A a membrane solution can be applied on the surface There is the need for a surface to exist. Due to different movements of the two building structures there is a shear gap in between (cavity) that could cause seepage hence wall is not accessible. Or it could be non-cooperative neighbour. Method B: is a waterproofing injection method. We pre-drill HILTI anchors and attach a waterproofing pressurised waterproofing liquid acrylic hose. And with pressure inject it and by expansion and compression fills the cavities

The LH Team

A a membrane solution can be applied on the surface There is the need for a surface to exist. Due to different movements of the two building structures there is a shear gap in between (cavity) that could cause seepage hence wall is not accessible. Or it could be non-cooperative neighbour. Method B: is a waterproofing injection method. We pre-drill HILTI anchors and attach a waterproofing pressurised waterproofing liquid acrylic hose. And with pressure inject it and by expansion and compression fills the cavities

Photoshooting

LH does all photo shooting in-house, and shot by our own designers as they understand the details they imagined the best. Customers appreciate this, as the return on their investment is increased by a more marketable project especially if leasing or selling

The LH Team

At LH personally ensuring Quality is maintained and upheld is one of the highest priorities.....

The LH Team

A true Design & Build Team has Construction in their DNA. At LH 40% of our Design Team has either been trained in Construction or has worked as a Trade onsite. This sets LH apart from other Team at get-go. Owner is certified in plumbing and electrical engineering

The LH Team

A true Design & Build Team has Construction in their DNA. At LH 40% of our Design Team has either been trained in Construction or has worked as a Trade onsite. This sets LH apart from other Team at get-go.